Project Stats
Duration
26 weeks
Value
£720K
Size
3,000 sq ft
Sector
Education
Project Story
Willmott Dixon Interiors were appointed to refurbish the existing combustion test laboratory area. This involved the demolition of existing wall and mezzanine structures and the construction of new walls and new mezzanine floors.
Thermal upgrades to the existing roof were included as part of the work. Works also involved Mechanical and Electrical refurbishment and alterations to suit the reconfigured layout and service proposed laboratory equipment, including new ducting and a flue to the roof.
The refurbishment will provide the University with materials production and aerosols instrumentation laboratory facilities.
Thermal upgrades to the existing roof were included as part of the work. Works also involved Mechanical and Electrical refurbishment and alterations to suit the reconfigured layout and service proposed laboratory equipment, including new ducting and a flue to the roof.
The refurbishment will provide the University with materials production and aerosols instrumentation laboratory facilities.
Project Outcomes
- Newly refurbished space in existing building
- Creation of specialist laboratory space
- Ongoing use of building enabled whilst works were carried out