Project Stats
Duration
45 weeks
Value
£12.6 m
Size
50,000 sq ft
Sector
Commercial
Project Story




We are pleased to be appointed by CenturyLink to help enable the migration of their employees from their current Fleet Place and Docklands location into the Goswell Road building.
The scope of works involve data centre reconfiguration and Cat A & Cat B fit out of office space at 260-265 Goswell Road. The 50,000 sq ft refurbished office accommodation involves the refurbishment and fit out of the existing 4th floor data centre, the 4th & 5th floors within the older building and part of the ground floor to provide a new staff entrance for the new offices. This will include lowering part of the ground floor suspended slab
to provide a new off-street entrance at grade. We will install three new external lifts including the construction of new lift shafts and will create a new roof terrace. The works also involve the part removal of the existing curtain walling and installation of new glazed elements along the 4th floor (data centre) northern elevation.
Our specialist team will install three new external lifts including the construction of new lift shafts and will be creating a new roof terrace. The works also involve the part removal of the existing curtain walling and installation of new glazed elements along the 4th floor northern elevation.
The team are also working under strict guidelines to avoid disrupting day to day operations of the live office environment.
The scope of works involve data centre reconfiguration and Cat A & Cat B fit out of office space at 260-265 Goswell Road. The 50,000 sq ft refurbished office accommodation involves the refurbishment and fit out of the existing 4th floor data centre, the 4th & 5th floors within the older building and part of the ground floor to provide a new staff entrance for the new offices. This will include lowering part of the ground floor suspended slab
to provide a new off-street entrance at grade. We will install three new external lifts including the construction of new lift shafts and will create a new roof terrace. The works also involve the part removal of the existing curtain walling and installation of new glazed elements along the 4th floor (data centre) northern elevation.
Our specialist team will install three new external lifts including the construction of new lift shafts and will be creating a new roof terrace. The works also involve the part removal of the existing curtain walling and installation of new glazed elements along the 4th floor northern elevation.
The team are also working under strict guidelines to avoid disrupting day to day operations of the live office environment.
Key Challenges
- Tight logistical inner London site
- Adjacent school and nearby stakeholders
- Working in a live environment
- Scheduled and just-in-time deliveries
- Social distancing measures amid Covid-19


Project Team
Tom McEvoy × Director of Operations
Connie Robson Velaetis × Commercial Sector Lead
Consultant team
Architect: Scott Brownrigg Limited
Project Manager : CBRE
Quantity Surveyor : CBRE
Services Engineer : GDM Partnership