We are doing everything we can to ensure we have continuity of business, while heeding the very latest Government advice. We monitor this daily and adapt our procedures and messaging immediately to any changes that are required. We would like to express our sympathies to everyone who has been affected and continues to be affected by the COVID-19 virus.

We would also like to show our support to our teams and key workers who are working tirelessly across the country.

For more about how Willmott Dixon group are responding to the everyday changes of Covid-19 please click here.

University of Wolverhampton, Wolverhampton

FULL REFURBISHMENT OF TWO BUILDINGS AT THE UNIVERSITY OF WOLVERHAMPTON.

Project Stats

Duration
17 weeks
Value
£4.4 m
Size
32,000 sq ft
Sector
Education

Project Story

Willmott Dixon Interiors are proud to be delivering the refurbishment of the Wulfruna Building and Alan Turing Building at the University of Wolverhampton to provide enhanced facilities for film and pharmacy students.

The refurbishment project will provide more than 32,000 sq ft of flexible and modern teaching spaces across the two buildings, with new finishes, layouts and furnishings.

Willmott Dixon Interiors will demolish some of the partition walls at the Wulfruna Building to form larger, multipurpose teaching spaces for use by the university’s School of Pharmacy.

The revamped facility will deliver a new pharmacy reception, as well as flexible practice and clinical skills areas, including a bespoke post-graduate teaching space and counselling rooms for the development of clinical and counselling skills.

The Alan Turing Building will undergo a refurbishment to the ground, second and part of the first floor, which will deliver a professional working environment for film, television and animation students.

Features of the new Wolverhampton Screen School will include new production space, an equipment media store, a video studio with movable partitions and a multipurpose studio which can accommodate a larger number of students. The contractor will also create new MAC labs, edit suites, staff offices and a production base room.
Key Challenges
  • A large site spread over two buildings and 3 floors.
  • Limited legacy information.
  • Integration of specialist contractors within a fast track build programme.
  • Restricted access for deliveries and loading.
  • Refurbishing circulation areas within an occupied building.

Project Team

Phil Crowther × Regional Director
Phil Taylor × Regional Customer Relationship Manager
Consultant team
Customer: University of Wolverhampton
Project Manager: Faithful+Gould
Architect: Glancy Nicholls Architects
Quantity Surveyor: Glancy Nicholls Architects
Structural Engineer: CWA