University of Brighton - Cockroft Building

Pre-construction services and design brief development

Project Stats

Duration
98 weeks
Value
£22 m
Size
150,000 sq ft
Sector
Education

Project Story

We were truly proud to be awarded this project, won under the iESE framework, to carry out pre-construction services for the Cockcroft Building and develop the design brief in conjunction with our project partners. We agreed with a design proposal including a complete strip-out on each floor, followed by a comprehensive refurbishment over 10 storeys. All the existing windows were replaced with new insulation and finishes installed on the existing roofs. A timber decking system created new terraces at the 8th floor, enhanced by the installation of new balustrades together with a brise soleil.
Project Challenges
  • New services provided throughout
  • Collaborative design services supplied
  • BIM level 1 implemented during the refurbishment
  • The works took place while the building remained in occupation

Project Team

Graham Shaw × Director
Stephen Hyde × S&M Contact
Consultant team
Architect: Fraser Brown Macenna
Structural Engineer: Curtins Consulting
Services Engineer: Mott MacDonald
Cost Consultant: Burnley Wilson Fish